Due to the world wide health situation in terra pax had to be shifted to September this year.
If all goes as planned, the working week will be from September 19th to 27th in Miedzyzdroje (Poland).
Due to the world wide health situation in terra pax had to be shifted to September this year.
If all goes as planned, the working week will be from September 19th to 27th in Miedzyzdroje (Poland).